๐Ÿ’ฐ

Cost Parameters

These settings are used to automatically calculate your production costs and profitability per batch.

โš™๏ธ
Configure costs
Navigation

Fields to Configure

Labor cost (โ‚ฌ/h)
Your hourly rate or that of your employees (e.g., 15โ‚ฌ/h)
Electricity cost (โ‚ฌ/kWh)
The price per kWh on your energy bill (e.g., 0.20โ‚ฌ/kWh)
Substrate cost (โ‚ฌ/bag)
Price of the substrate mix (straw + bran + gypsum) for one bag (e.g., 1.50โ‚ฌ)
Plastic bag cost (โ‚ฌ/unit)
Price of a cultivation bag (e.g., 0.15โ‚ฌ)
๐Ÿ’ฐ Example configuration:
Labor cost : 15.00 โ‚ฌ/h
Electricity cost : 0.20 โ‚ฌ/kWh
Substrate cost : 1.50 โ‚ฌ/bag
Plastic bag cost : 0.15 โ‚ฌ/unit

How these Costs are Used

MycoGest uses these settings to automatically calculate:

Indicator Calculation Example
Substrate cost Nb bags ร— (Price substrate + bag) 50 ร— 1.65โ‚ฌ = 82.50โ‚ฌ
Energy cost Consumption ร— Price kWh 60 kWh ร— 0.20โ‚ฌ = 12โ‚ฌ
Labor cost Time spent ร— Hourly rate 6h ร— 15โ‚ฌ = 90โ‚ฌ
๐Ÿ’ก
Tip: You can modify these settings later. Start with approximate values and refine over time based on your actual bills.